Update Deposit sent - and now, build pictures!

In pic 114 it looks like the AC in middle and the plug holes drilled to the AC power. Looks like the lower cabinets will be attached later as it appears to have the AC outlet in. Which are inside the cabinet.
 
Spray booth complete! Now they're moving on to building the galley, and now she has a frame!
Also in the first pic is Tim, working on her today (hi Tim!)
I see the super secret Toad project in work in background too. Or is that the hot tub prototype?

Srsly, j/k but interestingly enuff...
(Thread jack, interrupted, sorry!)
 
Last edited:
Back
Top